Shasta View Heights HOA - TA for Project Development
Project Overview
Basics
Shasta View Heights HOA - TA for Project Development
NCRP DACTI Technical Assistance
Completed
Technical Assistance was provided to develop a project to improve reliability, resiliency and safety of the Shasta View Heights HOA water distribution system and supply through the addition of isolation valves and backflow preventers.
2019
2019
2019
1/15/2024
Project Attributes
General Information
Project Description Narrative (1,000 character limit)
The existing distribution system was constructed in the 1960s and is in need of repair. The major deficiencies generally consist of a lack of distribution system and storage tank isolation valves, lack of backflow prevention devices, and the need for groundwater monitoring and inspections. A Technical Memorandum was developed to determine the most beneficial locations for isolation valves and prepare preliminary design for their installation.
Solutions
Capacity - Technical Assistance, Capacity - Year-round Local Capacity, Community Health and Safety - Community Infrastructure
Spatial Information
Tribal Region
None
Project Size (Acres)
None
Location
Organizations
Contract Manager | |
Funder | |
Project Sponsor |
Contacts
Katherine Gledhill - North Coast Resource Partnership (NCRP) (kgledhill@northcoastresourcepartnership.org)
Project Benefit Performance Measures
Expected Project Benefit Performance Measures
Capacity Enhancement - # of projects | 1 count | |
Capacity Enhancement - Type(s) of CE | Type: Infrastructure | 1 |
Environmental justice and social equity - # of projects | Activity focus: Infrastructure improvement | 1 count |
Jobs created or retained (FTE) | 0.1 | |
Technical Assistance - Type(s) of TA | Type of Technical Assistance: Assessments/ Appraisals/ Reports | 1 |
Reported Project Benefit Performance Measures
Capacity Enhancement - # of projects | ||
---|---|---|
2019 | Units | |
1 | count | |
Total | 1 | count |
Capacity Enhancement - Type(s) of CE | ||
---|---|---|
Type | 2019 | Units |
Infrastructure | 1 | number |
Total | 1 | number |
Environmental justice and social equity - # of projects | ||
---|---|---|
Activity focus | 2019 | Units |
Infrastructure improvement | 1 | count |
Total | 1 | count |
Jobs created or retained (FTE) | ||
---|---|---|
2019 | Units | |
0.1 | number | |
Total | 0.1 | number |
Technical Assistance - Type(s) of TA | ||
---|---|---|
Type of Technical Assistance | 2019 | Units |
Assessments/ Appraisals/ Reports | 1 | number |
Total | 1 | number |
Financials
Budget
Comment: | None provided |
---|
Reported Expenditures
2019 | Total | |
---|---|---|
NCRP Technical Assistance (DWR) | $15,000.00 | $15,000.00 |
Grand Total | $15,000.00 | $15,000.00 |
Note: | Technical Assistance |
---|
Project Types
Project Types
This project incorporates technical assistance from NCRP expert consultants to provide capacity lacking in project sponsor's organization.
Project Details
Attachments
No attachments
No attachments
No attachments
No attachments
Technical Memorandum
- Uploaded On
- 1/15/2024
- File Type
- Description
- Developed by PACE Engineering
Notes
No Notes entered.
External Links
No External Links entered.
Photos
Photos
No Photos available.