Water Supply Reliability and Lead Abatement Project
Project Overview
Basics
Water Supply Reliability and Lead Abatement Project
- Address Climate Change and Extreme Event Effects, Impacts and Vulnerabilities
- Conserve, Enhance and Restore Watersheds and Ecosystems that Support Biological Diversity
- Ensure that Disadvantaged and Underrepresented Communities Benefit from Initiatives
- Ensure Water Supply Reliability and Quality
- Respect Local Autonomy and Local Knowledge in NCRP Planning and Implementation
NCRP IRWM Prop 1 Round 2 (DWR)
Deferred/Unfunded
The proposed mitigation project, the City of Montague Water Supply Reliability and Lead Abatement Project (Project) will remove and replace the current red lead-linseed oil coated 500,000-gallon water tank, and remove the current red lead-linseed oil coated 30,000-gallon water storage tank and two pressure tanks formerly used in the sand filtration process. The project will address insufficient water storage and the lack of redundancy in the storage system.
2022
2023
1/10/2025
Project Attributes
General Information
Project Description Narrative (1,000 character limit)
One part of Montague Water Supply Reliability and Abatement Project will remove four water tanks (500,000 gallon tank, 30,0000 gallon tank, 2 pressure tanks) and replace the 500,000 water storage tank, which is not currently used due to condition. All four water tanks need to be removed because they are coated in red lead-linseed oil, which poses a health and safety threat to the surrounding population and ecosystem. A lead survey will be conducted to confirm the levels of lead present and evaluate the lead hazard. A lead abatement plan will be required as part of the demolition plans. Lead abatement would include the removal of lead paint from all or a portion of the tanks as well as removal of any materials contaminated with lead. The second part of the project will be to replace the 500,000-gallon water supply tank with a new steel tank and SCADA. This project would increase climate resiliency by providing a more resilient water supply to aid in drought and wildfire events.
Solutions
Capacity - Year-round Local Capacity, Climate Action - Adaptation, Community Health and Safety - Community Infrastructure, Ecosystem Conservation and Restoration - Water
Spatial Information
Tribal Region
None
Project Size (Acres)
None
Location
Organizations
Funder | |
Project Sponsor |
Contacts
No contacts set for this project.
Project Benefit Performance Measures
Expected Project Benefit Performance Measures
No expected Project Benefit Performance Measures set for this Project.
Reported Project Benefit Performance Measures
No annual Project Benefit Performance Measure accomplishments entered for this Project.
Financials
Budget
Comment: | None provided |
---|
Reported Expenditures
No Expenditures have been reported for this Project.
Note: | None provided |
---|
Project Types
Project Types
This project will provide a reliable and safe water supply for firefighting.
This project protects public health and provides safe water supply infrastructure in the disadvantaged community of Montague.
This project will protect the surrounding environment from lead pollution.
This project protects public health and provides a reliable and safe water supply for drinking water and firefighting water for the disadvantaged community of Montague.
Project Details
Attachments
No attachments
No attachments
No attachments
No attachments
No attachments
Notes
No Notes entered.
External Links
No External Links entered.
Photos
Photos
No Photos available.