Crescent City Area Regional Water Supply Augmentation
Project Overview
Basics
Crescent City Area Regional Water Supply Augmentation
NCRP IRWM Prop 1 Round 2 (DWR)
Implementation
Crescent City supplies water to an economically disadvantaged region from a single well near the Smith River. The shallow nature and proximity to the River make it vulnerable to surface water impacts (including hazardous materials spills) and drawdown during drought conditions. Crescent City is requesting funding for planning, design and installation of 2 new 12" municipal well(s) in the Smith River Groundwater Basin on property owned by the City adjacent to the main transmission line.
2022
2023
7/25/2024
Project Attributes
General Information
Project Description Narrative (1,000 character limit)
The City of Crescent City serving approximately 17,840 people, proposes to develop two new municipal groundwater wells to improve the resilience of the only major water source in the area. The City’s water is supplied from the Smith River via a well point type structure known and patented as a "Ranney Well." The well is located on the bank of the Smith River approximately 8.5 miles north of the City limits. Without a secondary water source the City is vulnerable to be without water should their Ranney Well be contaminated, or require any significant maintenance or repairs causing down time on this one water supply source. The final proposed project includes: planning, permitting, and drilling a test well that extends to bedrock to evaluate the hydrogeologic conditions specific to the Site and verify the depths and specifications for the two proposed wells. Upon completion of the pump test the test well can be converted into a monitoring well or emergency water source.
Solutions
Capacity - Year-round Local Capacity, Climate Action - Adaptation, Community Health and Safety - Community Infrastructure
Spatial Information
Tribal Region
None
Project Size (Acres)
5.36
acres
Location
Organizations
Funders | |
Project Sponsor |
Contacts
No contacts set for this project.
Project Benefit Performance Measures
Expected Project Benefit Performance Measures
Community Health and Safety - # of projects | Project type: Drinking water supply/ quality protection/ improvements | 1 count |
Environmental justice and social equity - # of projects | Activity focus: Infrastructure improvement | 1 count |
Water supply - infrastructure improvements | Project type: Infrastructure repair/improvement | 669 acre-ft |
Reported Project Benefit Performance Measures
No annual Project Benefit Performance Measure accomplishments entered for this Project.
Financials
Budget
Comment: | Updated based on Prop 1 funding award and budget provided by project sponsor |
---|
Reported Expenditures
2022 | 2023 | 2024 | 2025 | Total | |
---|---|---|---|---|---|
IRWM Proposition 1 Round 2 (DWR) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Matching Funds (Matching Funds) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Grand Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Note: | None provided |
---|
Project Types
Project Types
The test well will potentially be converted to a monitoring well when deeper wells are constructed.
This project will drill two new wells to improve water supply reliability.
This project will increase water supply reliability for the Crescent City, improving climate resiliency.
Project Details
Attachments
Project Application
- Uploaded On
- 2/10/2023
- File Type
- Description
Certification of Authority
- Uploaded On
- 2/10/2023
- File Type
- Description
No attachments
Technical and Supporting Documents
- Uploaded On
- 2/15/2023
- File Type
- Description
No attachments
Notes
No Notes entered.
External Links
No External Links entered.
Photos
Photos
No Photos available.