NCRP Project Tracker
NCRP Project Tracker
  • About
    • About NCRP Project Tracker
    • Project Application, Review, and Selection Process
    • Resources for Project Sponsors
  • Projects
    • Project Map
    • Full Project List
    • Requests for Proposals & Solicitations
    • Request for Technical Assistance Proposals
    • Add Project to NCRP Project Tracker
  • Program Info
    • Goals & Objectives
    • Project Types
    • Project Benefit Performance Measures
    • BIA Tribal Boundaries
    • Counties
    • Disadvantaged Community Status
    • Watersheds - HUC 12
    • Watersheds - HUC 8
    • Partners
    • Organizations
    • Funding Sources
    • Web Services
  • Outcomes
    • Project Summary Dashboard
  • Log In Toggle Dropdown
    • Forgot Password
    • Request Account
  • Help
    • Request Support
    • Training
    • Release Notes
    • Create an Account
    • About ProjectFirma
View Fact Sheet

Crescent City Area Regional Water Supply Augmentation

Back to all Projects
Proposal
Planning/Design
Implementation
Post-Implementation
Completed

Contents

Project Overview

Basics

CLEAN AND ABUNDANT WATER FOR HUMAN COMMUNITIES
Ensure Water Supply Reliability and Quality
Crescent City Area Regional Water Supply Augmentation

  • Improve Drinking Water Quality and Water Related Infrastructure to Protect Public Health
  • Respect Local Autonomy and Local Knowledge in NCRP Planning and Implementation

NCRP IRWM Prop 1 Round 2 (DWR)
Implementation
Crescent City supplies water to an economically disadvantaged region from a single well near the Smith River. The shallow nature and proximity to the River make it vulnerable to surface water impacts (including hazardous materials spills) and drawdown during drought conditions. Crescent City is requesting funding for planning, design and installation of 2 new 12" municipal well(s) in the Smith River Groundwater Basin on property owned by the City adjacent to the main transmission line.

2022
2023
7/25/2024

Project Attributes

General Information

Project Description Narrative (1,000 character limit)
The City of Crescent City serving approximately 17,840 people, proposes to develop two new municipal groundwater wells to improve the resilience of the only major water source in the area. The City’s water is supplied from the Smith River via a well point type structure known and patented as a "Ranney Well." The well is located on the bank of the Smith River approximately 8.5 miles north of the City limits. Without a secondary water source the City is vulnerable to be without water should their Ranney Well be contaminated, or require any significant maintenance or repairs causing down time on this one water supply source. The final proposed project includes: planning, permitting, and drilling a test well that extends to bedrock to evaluate the hydrogeologic conditions specific to the Site and verify the depths and specifications for the two proposed wells. Upon completion of the pump test the test well can be converted into a monitoring well or emergency water source.
Solutions
Capacity - Year-round Local Capacity, Climate Action - Adaptation, Community Health and Safety - Community Infrastructure

Spatial Information

Tribal Region
None
Project Size (Acres)
5.36 acres

Location

To zoom, hold down Shift and drag a rectangle.

  • Not Tribally owned land as identified by federal BIA map layer

  • Del Norte

  • Not in a mapped Disadvantaged Community

  • Tryon Creek-Frontal Pacific Ocean (180101010502)

  • Smith (18010101)

Organizations

Funders
  • California Department of Water Resources
  • Matching Funds Organization
Project Sponsor
  • City of Crescent City

Contacts

No contacts set for this project.

Project Benefit Performance Measures

Expected Project Benefit Performance Measures

Community Health and Safety - # of projects Project type: Drinking water supply/ quality protection/ improvements 1 count
Environmental justice and social equity - # of projects Activity focus: Infrastructure improvement 1 count
Water supply - infrastructure improvements Project type: Infrastructure repair/improvement 669 acre-ft

Reported Project Benefit Performance Measures

No annual Project Benefit Performance Measure accomplishments entered for this Project.

Financials

Budget

$653,536.00
$653,536.00
$0.00
$0.00
Total
IRWM Proposition 1 Round 2 (DWR) $500,000.00 $0.00 $500,000.00
Matching Funds (Matching Funds) $153,536.00 $0.00 $153,536.00
Total $653,536.00 $0.00 $653,536.00
Comment: Updated based on Prop 1 funding award and budget provided by project sponsor

Reported Expenditures

2022 2023 2024 2025 Total
IRWM Proposition 1 Round 2 (DWR) $0.00 $0.00 $0.00 $0.00 $0.00
Matching Funds (Matching Funds) $0.00 $0.00 $0.00 $0.00 $0.00
Grand Total $0.00 $0.00 $0.00 $0.00 $0.00

Note: None provided

Project Types

Project Types

The test well will potentially be converted to a monitoring well when deeper wells are constructed.
This project will drill two new wells to improve water supply reliability.
This project will increase water supply reliability for the Crescent City, improving climate resiliency.

Project Details

Attachments

Project Application
Uploaded On
2/10/2023
File Type
PDF
Description
Certification of Authority
Uploaded On
2/10/2023
File Type
PDF
Description

No attachments

Technical and Supporting Documents
Uploaded On
2/15/2023
File Type
PDF
Description

No attachments

Notes

No Notes entered.

External Links

No External Links entered.

Photos

Photos

No Photos available.

 

ProjectFirma is a service provided by Environmental Science Associates (ESA), which builds on the Tahoe Regional Planning Agency's EIP Project Tracker. This program is free software; you can redistribute it and/or modify it under the terms of the GNU Affero General Public License as published by the Free Software Foundation. Source code is available on GitHub.

Copyright (C) 2025 Tahoe Regional Planning Agency and ESA | Code last updated (compiled) at 2025-07-08 21:24:44.