Big Lagoon CSD Water Storage Improvements
Project Overview
Basics
Big Lagoon CSD Water Storage Improvements
- Address Climate Change and Extreme Event Effects, Impacts and Vulnerabilities
- Ensure that Disadvantaged and Underrepresented Communities Benefit from Initiatives
- Improve Drinking Water Quality and Water Related Infrastructure to Protect Public Health
- Respect Local Autonomy and Local Knowledge in NCRP Planning and Implementation
NCRP IRWM Prop 1 Round 2 (DWR)
Deferred/Unfunded
The proposed water storage improvements project will replace the two 5,000-gallon HDPE water tanks with a new steel 60,000-gallon water tank to improve water self-reliance and community health by ensuring the District has enough water to cover the maximum daily water usage, extended water outages due to a short-term or extended well failure, natural disasters, and/or other emergencies.
2022
2023
1/10/2025
Project Attributes
General Information
Project Description Narrative (1,000 character limit)
The Big Lagoon Community Services District (District) is supplied water from a single groundwater extraction well near the Big Lagoon Elementary School, and two 5,000-gallon HDPE storage tanks supplying 42 customers and the elementary school. The District has little backup resiliency should the well fail and need repair or require that a new well be drilled. This initial project will provide long term lasting benefits, and can be leveraged for future improvements. The new 60,000 gallon tank will be able to provide the maximum daily usage of 15,000 gallons and increase the District's fire supply by 50,000 gallons. This project will support current water usage, water resiliency in emergency situations, and will increase fire flow storage.
Solutions
Capacity - Year-round Local Capacity, Climate Action - Adaptation, Community Health and Safety - Community Infrastructure
Spatial Information
Tribal Region
None
Project Size (Acres)
None
Location
Organizations
Funder | |
Project Sponsor |
Contacts
No contacts set for this project.
Project Benefit Performance Measures
Expected Project Benefit Performance Measures
No expected Project Benefit Performance Measures set for this Project.
Reported Project Benefit Performance Measures
No annual Project Benefit Performance Measure accomplishments entered for this Project.
Financials
Budget
Comment: | None provided |
---|
Reported Expenditures
No Expenditures have been reported for this Project.
Note: | None provided |
---|
Project Types
Project Types
This project will increase water available for firefighting.
This project improves water supply infrastructure in a severely disadvantaged community.
This project will improve the Big Lagoon CSD's climate resiliency by increasing water supply reliability.
Project Details
Attachments
No attachments
No attachments
No attachments
No attachments
No attachments
Notes
No Notes entered.
External Links
No External Links entered.
Photos
Photos
No Photos available.