Weaver Basin Improvement Planning Project - TA for design
Project Overview
Basics
Weaver Basin Improvement Planning Project - TA for design
NCRP Technical Assistance Round 3
Deferred/Unfunded
Yurok Tribe is requesting technical assistance in support of the in-progress Weaver Creek restoration project. TA is needed for assessments of bridge and road conditions and sewer infrastructure from a structural engineer, and greenspace design from a landscape architect or recreational trails planner. Assistance with preliminary project design and planning as well as project benefits quantification is needed. Further, this funding would provide a needed non-federal match requirement for the overall project.
2022
2022
2023
4/21/2024
Project Attributes
General Information
Project Description Narrative (1,000 character limit)
Conservation needs in the Weaver Basin include stream habitat restoration for anadromous fish species of concern. Historically, colonial settlements in North America disregarded their infrastructure impacts on surrounding natural resources. Fraught with legacy impacts from gold mining and logging, Weaver Creek habitat is degraded in water quantity and quality, habitat connectivity, and ecological resilience. As risks from drought hand wildfire have increased, ecological resilience is paramount. These risks can be mitigated with increased habitat connectivity and wetland areas. The Weaver Basin Improvement Planning Project will inform opportunities for environmental improvement, community development, and public safety. The Yurok Tribe is currently undertaking a habitat restoration project on Weaver Creek. The scope of work needs to expand to include infrastructure improvement in the surrounding area.
Solutions
Capacity - Technical Assistance, Capacity - Tribal Capacity, Community Health and Safety - Community Infrastructure, Ecosystem Conservation and Restoration - Tribal Ecocultural Restoration, Ecosystem Conservation and Restoration - Water
Spatial Information
Tribal Region
North
Project Size (Acres)
None
Location
None Selected
N/A Tribal land
Organizations
Project Sponsor | |
Local and/or Political Support | Nor-Rel-Muk Tribe, Trinity County RCD, Trinity County Department of Transportation, USFS, BLM |
Contacts
Project Benefit Performance Measures
Expected Project Benefit Performance Measures
Capacity Enhancement - # of projects | 1 count | |
Capacity Enhancement - Type(s) of CE | Type: Technical Assistance | 1 |
Environmental justice and social equity - # of projects | Activity focus: Capacity building | 1 count |
Honoring & incorporating Tribal priorities - # of projects | 1 count | |
Jobs created or retained (FTE) | 0.1 | |
Technical Assistance - Type(s) of TA | Type of Technical Assistance: Assessments/ Appraisals/ Reports | 1 |
Technical Assistance - Type(s) of TA | Type of Technical Assistance: Plan development | 1 |
Reported Project Benefit Performance Measures
Capacity Enhancement - # of projects | ||
---|---|---|
2022 | Units | |
1 | count | |
Total | 1 | count |
Capacity Enhancement - Type(s) of CE | ||
---|---|---|
Type | 2022 | Units |
Technical Assistance | 1 | number |
Total | 1 | number |
Environmental justice and social equity - # of projects | ||
---|---|---|
Activity focus | 2022 | Units |
Capacity building | 1 | count |
Total | 1 | count |
Honoring & incorporating Tribal priorities - # of projects | ||
---|---|---|
2022 | Units | |
1 | count | |
Total | 1 | count |
Jobs created or retained (FTE) | ||
---|---|---|
2022 | Units | |
0.1 | number | |
Total | 0.1 | number |
Technical Assistance - Type(s) of TA | ||
---|---|---|
Type of Technical Assistance | 2022 | Units |
Assessments/ Appraisals/ Reports | 1 | number |
Plan development | 1 | number |
Total | 2 | number |
Financials
Budget
Comment: | None provided |
---|
Reported Expenditures
No Expenditures have been reported for this Project.
Note: | Note: this project was provided with grant development assistance through other funding sources rather than formally through the TA program. |
---|
Project Types
Project Types
Technical assistance would provide capacity that the sponsor organization lacks: greenspace design by a landscape architect and engineering design of roads and trails.
Project includes feasibility study and condition and cost assessments for bridge and road improvements, and sewer infrastructure in project area.
This project is part of a larger, ongoing Weaver Creek ecosystem restoration project.
Project Details
Attachments
NCRP TA Proposal - Yurok Tribe Weaver Basin Improvements
- Uploaded On
- 10/26/2022
- File Type
- Description
No attachments
No attachments
No attachments
No attachments
Notes
No Notes entered.
External Links
No External Links entered.
Photos
Photos
No Photos available.