Additional Groundwater Well for the City of Crescent City - TA for Feasibility Study
Skip to main content
To zoom, hold down Shift and drag a rectangle.
Project Overview
Basics
Additional Groundwater Well for the City of Crescent City - TA for Feasibility Study
NCRP DACTI Technical Assistance
Completed
The City of Crescent City supplies water to City and County customers which include Bertch Ocean View CSD, Elk Valley Rancheria, and Pelican Bay State Prison from a single groundwater extraction well near the Smith River within the Smith River Groundwater Plain. There are no adjacent or surrounding public water supply systems that can provide water to the region. The shallow nature of the well and proximity to the Smith River makes it vulnerable to surface water contaminants and drawdown during extreme drought conditions. The City of Crescent City is requesting technical assistance for the preparation of a feasibility study of a new well location in the Smith River Groundwater Basin.
2022
2022
2022
4/21/2024
Project Attributes
General Information
Project Description Narrative (1,000 character limit)
Perform a technical feasibility study on a new groundwater well location. Currently the City of Crescent City is the sole provider of water to the regional customer base from a single groundwater extraction well. If the existing well goes offline for any reason - extreme drought, contamination, mechanical failure, natural disaster - there are no other water sources for the Crescent City region. This project will evaluate a second potential source of water (groundwater within the Smith River Plain Groundwater Basin) that could provide water if the single existing groundwater well failed or became unfit for use. Project objectives are: determine feasibility of new groundwater well at City owned site; determine best construction technique for new well; determine cost of new well; determine cost of connection to the main transmission line.
Solutions
Capacity - Technical Assistance, Community Health and Safety - Community Infrastructure
Spatial Information
Tribal Region
None
Project Size (Acres)
5
acres
Location
Organizations
| Contract Manager | |
| Funder | |
| Partners | |
| Project Sponsor | |
| Local and/or Political Support | Elk Valley Rancheria, Pelican Bay State Prison, Bertch Ocean View CSD |
Contacts
Project Benefit Performance Measures
Expected Project Benefit Performance Measures
| Capacity Enhancement - # of projects | 1 count | |
| Capacity Enhancement - Type(s) of CE | Type: Technical Assistance | 1 |
| Environmental justice and social equity - # of projects | Activity focus: Capacity building | 1 count |
| Jobs created or retained (FTE) | 0.1 | |
| Technical Assistance - Type(s) of TA | Type of Technical Assistance: Assessments/ Appraisals/ Reports | 1 |
Reported Project Benefit Performance Measures
| Capacity Enhancement - # of projects | ||
|---|---|---|
| 2022 | Units | |
| 1 | count | |
| Total | 1 | count |
| Capacity Enhancement - Type(s) of CE | ||
|---|---|---|
| Type | 2022 | Units |
| Technical Assistance | 1 | number |
| Total | 1 | number |
| Environmental justice and social equity - # of projects | ||
|---|---|---|
| Activity focus | 2022 | Units |
| Capacity building | 1 | count |
| Total | 1 | count |
| Grant applications submitted - # of proposals | ||
|---|---|---|
| 2022 | Units | |
| 1 | number | |
| Total | 1 | number |
| Grants received - dollar amount awarded | ||
|---|---|---|
| 2022 | Units | |
| $500,000 | ||
| Total | $500,000 | |
| Jobs created or retained (FTE) | ||
|---|---|---|
| 2022 | Units | |
| 0.1 | number | |
| Total | 0.1 | number |
| Technical Assistance - Type(s) of TA | ||
|---|---|---|
| Type of Technical Assistance | 2022 | Units |
| Assessments/ Appraisals/ Reports | 1 | number |
| Total | 1 | number |
Financials
Budget
| Comment: | None provided |
|---|
Reported Expenditures
| 2022 | Total | |
|---|---|---|
| NCRP Technical Assistance (DWR) | $15,000.00 | $15,000.00 |
| Grand Total | $15,000.00 | $15,000.00 |
| Note: | None provided |
|---|
Project Types
Project Types
Technical assistance for the feasibility study provides capacity that the organization lacks.
This project will Improve reliability and resiliency of water supply for City of Crescent City as well as its customers, including Elk Valley Rancheria, Bertch Ocean View CSD, Pelican Bay State Prison, and city and county water customers.
Project Details
Attachments
NCRP TA Proposal - City of Crescent City Groundwater Well Feasibility Study
- Uploaded On
- 10/4/2022
- File Type
- Description
No attachments
No attachments
No attachments
No attachments
Notes