Big Lagoon CSD requests technical assistance to asses the water storage situation and recommend how best to increase water storage capacity while considering both water quality and fire flow. Consultant should provide recommendation for water tank of optimal size made of a material best suited for the coastal environment that will meet the potable water needs of residents and improve fire flow capacity needs.
2022
2022
2023
4/19/2024
Project Attributes
General Information
Project Description Narrative (1,000 character limit)
Big Lagoon CSD was formed in 1999 to purchase and operate what had been a privately owned water system. At the time total water storage capacity was 23K gallons. The original aged and leaking tanks were replaced by the district in 2010 with two 5K poly tanks. These 10K gallons support the drinking and fire flow needs of 42 customers, one of which is Big Lagoon Elementary School. Big Lagoon CSD has little backup resiliency should the well fail and need repair or require that a new well be drilled. CalFire and the local Fire Marshall have asked that our storage capacity be increased to better meet school fire flow requirements. Key objective is to increase water storage capacity above current 10K gallon capacity to provide potable water resilience in emergency situations and to better meet fire flow needs. Assistance is needed to determine what size tank is optimum, whether a single tank or several smaller tanks linked together is optimum, and what tank composition is warranted.
Solutions
Capacity - Data and Planning, Capacity - Technical Assistance, Community Health and Safety - Community Infrastructure
Spatial Information
Tribal Region
None
Project Size (Acres)
85
acres
Location
Organizations
Contract Manager | |
Project Sponsor |
Contacts
Project Benefit Performance Measures
Expected Project Benefit Performance Measures
Capacity Enhancement - Type(s) of CE | Type: Technical Assistance | 1 |
Technical Assistance - Type(s) of TA | Type of Technical Assistance: Assessments/ Appraisals/ Reports | 1 |
Reported Project Benefit Performance Measures
Capacity Enhancement - Type(s) of CE | ||||
---|---|---|---|---|
Type | Total | 2023 | 2022 | Units |
Technical Assistance | 1 | N/A | 1 | number |
Total | 1 | 0 | 1 | number |
Grant applications submitted - # of proposals | ||||
---|---|---|---|---|
Total | 2023 | 2022 | Units | |
1 | 1 | N/A | number | |
Total | 1 | 1 | 0 | number |
Grant applications submitted - dollar amount applied for | ||||
---|---|---|---|---|
Total | 2023 | 2022 | Units | |
$947,950 | $947,950 | N/A | ||
Total | $947,950 | $947,950 | $0 |
Technical Assistance - Type(s) of TA | ||||
---|---|---|---|---|
Type of Technical Assistance | Total | 2023 | 2022 | Units |
Assessments/ Appraisals/ Reports | 1 | N/A | 1 | number |
Total | 1 | 0 | 1 | number |
Financials
Budget
Comment: | None provided |
---|
Reported Expenditures
No Expenditures have been reported for this Project.
Note: | None provided |
---|
Project Types
Project Types
Technical assistance will provide design and planning capacity that the organization lacks.
Project Details
Attachments
NCRP TA Proposal - Big Lagoon CSD Water Storage Improvements
- Uploaded On
- 10/4/2022
- File Type
- Word (DOCX)
- Description
No attachments
No attachments
No attachments
No attachments
Notes
No Notes entered.
External Links
No External Links entered.