NCRP Project Tracker
NCRP Project Tracker
  • About
    • About NCRP Project Tracker
    • Project Application, Review, and Selection Process
    • Resources for Project Sponsors
  • Projects
    • Project Map
    • Full Project List
    • Requests for Proposals & Solicitations
    • Request for Technical Assistance Proposals
    • Add Project to NCRP Project Tracker
  • Program Info
    • Goals & Objectives
    • Project Types
    • Project Benefit Performance Measures
    • BIA Tribal Boundaries
    • Counties
    • Disadvantaged Community Status
    • Watersheds - HUC 12
    • Watersheds - HUC 8
    • Partners
    • Organizations
    • Funding Sources
    • Web Services
  • Outcomes
    • Project Summary Dashboard
  • Log In Toggle Dropdown
    • Forgot Password
    • Request Account
  • Help
    • Request Support
    • Training
    • Release Notes
    • Create an Account
    • About ProjectFirma
View Fact Sheet

Newell Water System Renovation

Back to all Projects
Proposal
Planning/Design
Implementation
Post-Implementation
Completed

Contents

Project Overview

Basics

CLEAN AND ABUNDANT WATER FOR HUMAN COMMUNITIES
Improve Drinking Water Quality and Water Related Infrastructure to Protect Public Health
Newell Water System Renovation

  • Address Climate Change and Extreme Event Effects, Impacts and Vulnerabilities
  • Conserve, Enhance and Restore Watersheds and Ecosystems that Support Biological Diversity
  • Ensure that Disadvantaged and Underrepresented Communities Benefit from Initiatives
  • Ensure Water Supply Reliability and Quality
  • Protect and Enhance Watersheds and Ecosystems that Provide Water Quality and Supply Benefits
  • Respect Local Autonomy and Local Knowledge in NCRP Planning and Implementation

NCRP IRWM Prop 50 R1 (SWRCB)
Completed
The Newell County Water District water system renovation project has dramatically reduced treated drinking water losses from storage, transmission, and distribution system. The project has vastly improved water use efficiency and significantly improved the safety of the water system and improved environmental resources by reducing groundwater pumping and reduced potential contamination risks to the wildlife and habitat of the Clear Lake and Tulelake National Wildlife Refuges.

2006
2008
2008
11/26/2023

Project Attributes

General Information

Project Description Narrative (1,000 character limit)
The Newell drinking water system consisted of three wells, two storage tanks (25,000 and 100,000 gallons) and an unknown length of distribution and lateral service pipelines. Approximately 25,000 feet of the known system was original steel pipe dating from the 1940s and there were also ductile iron pipes with leaded joints. All of these pipes were still in use far beyond their useful life and inspections showed that the pipes were rusting from the inside out. Only two of the District’s three wells were operational; Well No. 3 was not functioning. Water from all three pumps needed to be redirected to storage before entering the distribution system to correct chlorination contact time deficiencies. Additionally, an old well that had not been properly abandoned had the potential to further contaminate the water system.
Solutions
Capacity - Year-round Local Capacity, Climate Action - Adaptation, Community Health and Safety - Community Infrastructure

Spatial Information

Tribal Region
None
Project Size (Acres)
None

Location

To zoom, hold down Shift and drag a rectangle.

  • Not Tribally owned land as identified by federal BIA map layer

  • Modoc

  • Severely Disadvantaged Community

  • Mills Creek-Tule Lake Valley (180102040906)

  • Lost (18010204)

Organizations

Contract Manager
  • County of Humboldt
Funders
  • California State Water Resources Control Board
  • Matching Funds Organization
Project Sponsor
  • County of Modoc

Contacts

Kate Reza - North Coast Resource Partnership (NCRP) (kreza@northcoastresourcepartnership.org)

Project Benefit Performance Measures

Expected Project Benefit Performance Measures

Avoided Costs Cost category: Water supply and/ or treatment costs $70,000.00
Environmental justice and social equity - # of projects Activity focus: Infrastructure improvement 1 count
Firefighting capacity/infrastructure improved - # of projects 1 count
Jobs created or retained (FTE) 9
Water supply - infrastructure improvements Project type: Infrastructure repair/improvement 105.29 acre-ft
Water supply improved - households impacted 194

Reported Project Benefit Performance Measures

Avoided Costs
Cost category 2008 Units
Water supply and/ or treatment costs $70,000
Total $70,000

Community Health and Safety - # of projects
Project type 2008 Units
Drinking water supply/ quality protection/ improvements 1 count
Total 1 count

Environmental justice and social equity - # of projects
Activity focus 2008 Units
Infrastructure improvement 1 count
Total 1 count

Firefighting capacity/infrastructure improved - # of projects
2008 Units
1 count
Total 1 count

Jobs created or retained (FTE)
2008 Units
9 number
Total 9 number

Water supply - infrastructure improvements
Project type 2008 Units
Infrastructure repair/improvement 105.29 acre-ft
Increased storage 0.3 acre-ft
Total 105.59 acre-ft

Water supply improved - households impacted
2008 Units
245 number
Total 245 number

Financials

Budget

$1,493,228.00
$1,493,228.00
$0.00
$0.00
Total
IRWM Prop 50 R1 (SWRCB) (Inactive) $1,485,228.00 $0.00 $1,485,228.00
Matching Funds (Matching Funds) $8,000.00 $0.00 $8,000.00
Total $1,493,228.00 $0.00 $1,493,228.00
Comment: None provided

Reported Expenditures

2006 2007 2008 Total
IRWM Prop 50 R1 (SWRCB) (Inactive) $0.00 $0.00 $1,485,228.00 $1,485,228.00
Matching Funds (Matching Funds) $0.00 $0.00 $8,000.00 $8,000.00
Grand Total $0.00 $0.00 $1,493,228.00 $1,493,228.00

Note: None provided

Project Types

Project Types

The project enhances fire preparedness through installation of new fire hydrants.
The project implemented infrastructure improvements to water treatment and delivery infrastructure for the disadvantaged community of Newell.
Project implementation has reduced potential contamination risks to the wildlife and habitat of the Clear Lake and Tulelake National Wildlife Refuges, thus enhancing watershed conditions.
By implementing infrastructure improvements to increase water supply quality and reliability, this project enhances the community of Newell's climate resiliency.

Project Details

Attachments

No attachments

No attachments

No attachments

No attachments

No attachments

Notes

No Notes entered.

External Links

No External Links entered.

Photos

Photos

  •  

    New welded steel 100,000 gallon drinking water storage tank
(Timing: After) (~69 KB)
Credit: The County of Modoc

    New welded steel 100,000 gallon drinking water storage tank
    (Timing: After) (~69 KB)
  •  

    Original steel pipe from 1940's rusting from inside out and leakes introducing bacteria into the system
(Timing: Before) (~241 KB)
Credit: The County of Modoc

    Original steel pipe from 1940's rusting from inside out and leakes introducing bacteria into the system
    (Timing: Before) (~241 KB)
  •  

    Project contruction
(Timing: During) (~167 KB)
Credit: County of Modoc

    Project contruction
    (Timing: During) (~167 KB)
  •  

    Project contruction
(Timing: During) (~182 KB)
Credit: County of Modoc

    Project contruction
    (Timing: During) (~182 KB)

 

ProjectFirma is a service provided by Environmental Science Associates (ESA), which builds on the Tahoe Regional Planning Agency's EIP Project Tracker. This program is free software; you can redistribute it and/or modify it under the terms of the GNU Affero General Public License as published by the Free Software Foundation. Source code is available on GitHub.

Copyright (C) 2025 Tahoe Regional Planning Agency and ESA | Code last updated (compiled) at 2025-07-08 21:24:44.