Water Tank Seismic Retrofit Project
Project Overview
Basics
Water Tank Seismic Retrofit Project
NCRP IRWM Prop 1 Round 1 (DWR)
Implementation
The proposed seismic retrofit is to install a new 400,000 gallon bolted steel water tank. The problem this project is attempting to solve is potential loss of Potable and Wastewater services to the Fieldbrook Glendale Community Services District due to earthquake hazards, as well as potential loss of water for emergency fire fighting for the surrounding areas.
2019
2020
11/26/2023
Project Attributes
General Information
Project Description Narrative (1,000 character limit)
The Project will replace an existing redwood tank with a new 400,000 gallon bolted steel water tank. The new tank would be constructed to modern seismic standards, including ASCE 7 code for a critical facility. This Project will eliminate the risk of the tank and foundation failing and the associated damage and loss of water, wastewater, and fire service. The project will provide 400,000 gallons of increased water supply reliability.
Solutions
Climate Action - Adaptation, Community Health and Safety - Community Emergency Planning, Community Health and Safety - Community Infrastructure
Spatial Information
Tribal Region
None
Project Size (Acres)
None
Location
Organizations
Contract Manager | |
Funder | |
Partners | |
Project Sponsor |
Contacts
Project Benefit Performance Measures
Expected Project Benefit Performance Measures
Avoided Costs | Cost category: Injury and/ or property damage | $56,611.00 |
Avoided Costs | Cost category: Emergency Repairs and service disruptions | $64,521.00 |
Community Health and Safety - # of projects | Project type: Drinking water supply/ quality protection/ improvements | 1 count |
Environmental justice and social equity - # of projects | Activity focus: Infrastructure improvement | 1 count |
Firefighting capacity/infrastructure improved - # of projects | 1 count | |
Jobs created or retained (FTE) | 2 | |
Water supply - infrastructure improvements | Project type: Infrastructure repair/improvement | 1.23 acre-ft |
Water supply improved - households impacted | 617 |
Reported Project Benefit Performance Measures
Avoided Costs | ||
---|---|---|
Cost category | 2022 | Units |
Emergency Repairs and service disruptions | $0 | |
Injury and/ or property damage | $0 | |
Total | $0 |
Community Health and Safety - # of projects | ||
---|---|---|
Project type | 2022 | Units |
Drinking water supply/ quality protection/ improvements | 1 | count |
Total | 1 | count |
Environmental justice and social equity - # of projects | ||
---|---|---|
Activity focus | 2022 | Units |
Infrastructure improvement | 1 | count |
Total | 1 | count |
Firefighting capacity/infrastructure improved - # of projects | ||
---|---|---|
2022 | Units | |
1 | count | |
Total | 1 | count |
Jobs created or retained (FTE) | ||
---|---|---|
2022 | Units | |
0 | number | |
Total | 0 | number |
Water supply - infrastructure improvements | ||
---|---|---|
Project type | 2022 | Units |
Infrastructure repair/improvement | 0 | acre-ft |
Total | 0 | acre-ft |
Water supply improved - households impacted | ||
---|---|---|
2022 | Units | |
0 | number | |
Total | 0 | number |
No accomplishments to report for: | |
Year(s): | 2020-2021 |
---|---|
Explanation: | No accomplishments reported. |
Financials
Budget
Comment: | None provided |
---|
Reported Expenditures
No Expenditures have been reported for this Project.
Note: | No expenditures have been reported |
---|
Project Types
Project Types
The project guards against water loss in the event of an earthquake, which could cause fires through ruptured gas lines. The seismically reinforced, new water tank will have water to fight fires that occur post-earthquake.
Seismic stabilization improves water supply infrastructure.
This project enhances climate and disaster resiliency through seismic retrofit of the water tank. The new infrastructure will also be more resilient to the severe weather occurring due to climate change. The enhanced water supply reliability will improve community drought resiliency.
Project Details
Attachments
No attachments
No attachments
No attachments
No attachments
No attachments
Notes
No Notes entered.
External Links
No External Links entered.
Photos
Photos